Image 1 of 10
Image 2 of 10
Image 3 of 10
Image 4 of 10
Image 5 of 10
Image 6 of 10
Image 7 of 10
Image 8 of 10
Image 9 of 10
Image 10 of 10
Greenfield Contractors Soil Vapor Extraction SVE Air Sparge Trailer-Mounted Remediation System
GreenField Trailer-Mounted SVE and Air-Sparge Remediation System
Mobile environmental remediation system installed in a tandem-axle Tailwind enclosed trailer and configured for combined soil vapor extraction, air sparging, condensate separation and liquid transfer. The trailer carries GreenField Contractors branding and is designed as a self-contained field unit for connecting to multiple remediation wells.
The system includes separate process manifolds for vapor extraction and compressed-air distribution. Each manifold branch is equipped with an individual valve, flow meter or gauge, allowing operators to balance and monitor multiple wells independently.
Major equipment and features
AMETEK Rotron regenerative blower
Model EN858BD72WL
Part number 038744
Three-phase electrical service
200–240/380–415 volts
Maximum continuous-duty rating of approximately:
100 inches H₂O vacuum
110 inches H₂O pressure
Gardner Denver DTA 100 C compressor package
Approximately 116 m³/hour rated capacity
Approximately 1.5-bar operating-pressure rating shown on the nameplate
Marathon 7½-horsepower motor
Three phase
208–230/460 volts
1,750 RPM
Continuous-duty, TEFC enclosure
AMETEK moisture separator
Vertical knockout or moisture-separation vessel
Fiberglass treatment or filtration vessel
Solberg inlet filter/separator
Integrated liquid-transfer equipment
Multiple clear-column flow meters
Individual well-control valves and pressure/vacuum gauges
Separate compressed-air manifolds
Multiple exterior quick-connect process ports
Roof-mounted process exhausts
Exterior electrical disconnect and power equipment
Interior ventilation and heating equipment
Automated control system
The system is equipped with a substantial electrical and automation package, including:
Touchscreen operator interface
AutomationDirect DirectLOGIC DL06 PLC
Individual motor starters, contactors, overloads and relays
Hand/Off/Auto controls
Separate controls for:
SVE blower
System pump
Transfer pump
Sparge header No. 1
Sparge header No. 2
Equipment hour meters
Alarm indicator
Clearly labeled terminal wiring and control components
This GreenField trailer-mounted remediation system provides a centralized platform for operating a multi-well soil vapor extraction and air-sparging project. The package combines a regenerative SVE blower, air compressor, moisture-separation equipment, process vessels, transfer equipment, multi-line manifolds and PLC-based controls inside a weather-protected mobile enclosure.
The extensive manifold arrangement allows multiple extraction and injection wells to be connected and adjusted independently. Two controlled sparge headers provide additional flexibility for dividing a remediation site into separate operating zones.
The equipment appears substantially complete and professionally assembled. Cosmetic wear, exterior staining and normal signs of prior field use are visible. The system has not been fully function-tested by the current owner and is being offered as-is, with operating condition, electrical requirements, process configuration and component specifications to be confirmed by the buyer.
GreenField Trailer-Mounted SVE and Air-Sparge Remediation System
Mobile environmental remediation system installed in a tandem-axle Tailwind enclosed trailer and configured for combined soil vapor extraction, air sparging, condensate separation and liquid transfer. The trailer carries GreenField Contractors branding and is designed as a self-contained field unit for connecting to multiple remediation wells.
The system includes separate process manifolds for vapor extraction and compressed-air distribution. Each manifold branch is equipped with an individual valve, flow meter or gauge, allowing operators to balance and monitor multiple wells independently.
Major equipment and features
AMETEK Rotron regenerative blower
Model EN858BD72WL
Part number 038744
Three-phase electrical service
200–240/380–415 volts
Maximum continuous-duty rating of approximately:
100 inches H₂O vacuum
110 inches H₂O pressure
Gardner Denver DTA 100 C compressor package
Approximately 116 m³/hour rated capacity
Approximately 1.5-bar operating-pressure rating shown on the nameplate
Marathon 7½-horsepower motor
Three phase
208–230/460 volts
1,750 RPM
Continuous-duty, TEFC enclosure
AMETEK moisture separator
Vertical knockout or moisture-separation vessel
Fiberglass treatment or filtration vessel
Solberg inlet filter/separator
Integrated liquid-transfer equipment
Multiple clear-column flow meters
Individual well-control valves and pressure/vacuum gauges
Separate compressed-air manifolds
Multiple exterior quick-connect process ports
Roof-mounted process exhausts
Exterior electrical disconnect and power equipment
Interior ventilation and heating equipment
Automated control system
The system is equipped with a substantial electrical and automation package, including:
Touchscreen operator interface
AutomationDirect DirectLOGIC DL06 PLC
Individual motor starters, contactors, overloads and relays
Hand/Off/Auto controls
Separate controls for:
SVE blower
System pump
Transfer pump
Sparge header No. 1
Sparge header No. 2
Equipment hour meters
Alarm indicator
Clearly labeled terminal wiring and control components
This GreenField trailer-mounted remediation system provides a centralized platform for operating a multi-well soil vapor extraction and air-sparging project. The package combines a regenerative SVE blower, air compressor, moisture-separation equipment, process vessels, transfer equipment, multi-line manifolds and PLC-based controls inside a weather-protected mobile enclosure.
The extensive manifold arrangement allows multiple extraction and injection wells to be connected and adjusted independently. Two controlled sparge headers provide additional flexibility for dividing a remediation site into separate operating zones.
The equipment appears substantially complete and professionally assembled. Cosmetic wear, exterior staining and normal signs of prior field use are visible. The system has not been fully function-tested by the current owner and is being offered as-is, with operating condition, electrical requirements, process configuration and component specifications to be confirmed by the buyer.